Maharashtra's integrated township rules, explained for landowners

If you own 100 acres or more in most of Maharashtra outside Mumbai, Regulation 14.1 of UDCPR 2020 decides whether your land can become a township, and on what terms.

A town-planning layout drawing of a generic township on a drafting table
AI-generated image. It does not show a real project.
The short answer

Under Regulation 14.1 of Maharashtra's UDCPR 2020, with changes the Government directed to apply from 5 March 2024, an integrated township requires at least 40 hectares (about 100 acres) of contiguous land with an 18-metre access road, and the developer needs ownership or registered development rights in every parcel. The State grants a locational clearance and the Collector a letter of intent; the Collector or planning authority approves the master layout. The developer pays a zone premium where one applies, and a premium for extra FSI of up to 100% of basic FSI. The regulation provides a 50% stamp-duty concession at one stage, no separate non-agricultural permission and other concessions.

Maharashtra has had a special route for large, self-contained townships for many years. Today it sits in Regulation 14.1 of the Unified Development Control and Promotion Regulations (UDCPR 2020). As sanctioned in 2020, these apply across Maharashtra except Greater Mumbai, MIDC, NAINA and JNPT areas, hill-station municipal councils and Lonavala, and eco-sensitive regions notified by the Union environment ministry.1 This explainer sets out what the rule asks of a landowner and what it gives back. It describes the regulation as sanctioned in December 2020 and the changes the Government directed to apply from 5 March 2024. We have not found any later change, so the planner or lawyer advising you should confirm the current text.

The basics VERIFIED

Requirement What UDCPR 2020 says
Minimum area 40 hectares (about 100 acres), contiguous. Land divided by roads, nallahs, railways or pipelines still counts as one piece if the developer builds the connecting roads or bridges
Very large townships Over 200 ha may be in parcels, each over 40 ha, all within a 5 km radius, with the mix of land uses kept in each parcel
Access road 18 m. Where the 18 m road is only planned, an existing 12 m road is enough for the locational clearance and letter of intent, but 18 m access is needed before the commencement certificate covers more than 25% of the FSI
Ownership The developer must own every parcel. Ownership includes rights under registered development agreements or powers of attorney
Constrained land Hill slopes, eco-sensitive and national-park buffers and flood zones together can be at most 40% of the area. Nothing may be built on hill slopes, within the flood line or on slopes of 1:5 or steeper
Excluded land Notified forest, water bodies, mangroves, land within the high tide line (added in March 2024), national parks, defence land, SEZs, gaothan and similar

Source: UDCPR 2020, Regulations 14.1.1.2 and 14.1.1.3, as sanctioned in December 2020, and the changes directed in March 2024.16

How approval works VERIFIED

  1. Locational clearance. The developer applies to the State Government with the ownership papers, including any registered development agreements. The State grants the clearance after consulting a High Power Committee chaired by the Urban Development Department's Principal Secretary, and publishes it in the Official Gazette. The committee was added by the March 2024 changes; the 2020 text named the Director of Town Planning.6 The decision is due within 90 days of the application, or of the developer's reply to any query, whichever is later. The clearance lapses after two years if no letter of intent has been applied for; the Director of Town Planning can extend it by up to two years.
  2. Letter of intent. Issued by the Collector, due within 45 days, for at least 40 ha at first. The Collector must first be satisfied that the developer holds ownership and development rights in all the land.
  3. Master layout plan. Approved by the Collector after technical remarks from the Divisional Joint Director of Town Planning. In a development-plan area the planning authority approves it, and consults the Joint Director if its own planning officer is below that rank.
  4. Environmental clearance, building permissions and RERA registration. Work cannot start until the project has environmental clearance, which must accompany the building-permission application.1 Each phase then needs its own building permission and its own RERA registration before it can be advertised or sold.2

The application to the State carries a non-refundable processing fee. The regulation set it at ₹5,000 per hectare, rising by ₹500 per hectare every January, so check the current rate with the Town Planning office.1

What the township must provide VERIFIED

  • Open space: gardens and parks of 5% of the master layout area, playgrounds of 7.5%, and a further 10% open space in sector-level layouts.
  • Town-level amenities: land and built space for schools, health care and a market, among others, increasing with the size of the layout.
  • City-level facilities (inside a planning authority’s area): 2% of the land is handed to the planning authority free of cost. Under the March 2024 changes it is worked out after deducting land reserved in the development or regional plan (other than roads), and a developer that builds the facility and hands it over can earn transferable development rights.6 The 2% counts towards the 40 hectares, and its basic FSI can be used on the rest of the land.
  • Social housing: at least 15% of the residential basic FSI must be built as economically weaker section (EWS) and lower income group (LIG) homes, 25% of it EWS and 75% LIG. A third of these homes must be kept for rent. The rest are allotted through a MHADA lottery and sold at a capped price: the construction cost in the Annual Statement of Rates plus 25%. If MHADA does not supply buyers within six months, the developer sells them on the open market at the construction cost plus 20%. The regulation allows extra FSI for this housing, on top of the township’s other FSI and free of premium.
  • Infrastructure: the developer builds and maintains the roads, water supply, drainage and street lights until they are handed over, and gives a bank guarantee of 15% of the estimated cost of the basic infrastructure.1 Under the March 2024 changes the guarantee is released in stages as the infrastructure is built, and is not needed where the basic infrastructure is built before building permission is sought.6
  • Green rating: the buildings must have at least a 3-star GRIHA rating or, under the March 2024 changes, a Silver IGBC or LEED rating or an equivalent ASSOCHAM GEM rating.16

What the township gets in return

  • Basic FSI of 1.0 on the gross area. If the land is in a zone other than residential, commercial or the U1 and U2 zones, for example an agricultural zone, the developer first pays a zone premium, based on the land’s agricultural rate in the Annual Statement of Rates: 10% for agricultural and most other zones, 15% for afforestation and hill zones, and 8% for public, industrial and some other zones. The March 2024 changes keep these rates, refer to development-plan zones as well as regional-plan zones, and add mangrove and coastal-regulation (CRZ) areas to the 10% band. A note in the changes says this provision applies only to new townships in development-plan areas, and it is not clear how far that limit reaches, so ask the Town Planning office how the zone premium applies to your land.6 It is paid in stages: 10% at locational clearance, 10% at the letter of intent, 20% at master layout approval, and the rest in four yearly instalments with interest.1
  • Extra FSI for a further premium of 10% of the land’s weighted average rate in the Annual Statement of Rates, paid at building permission. As sanctioned in 2020, the extra FSI depended on size: up to 70% of basic FSI for 40 to 200 ha, 80% for 200 to 500 ha and 100% above 500 ha.1 Under the changes the Government directed to apply from 5 March 2024, every township can have extra FSI of 100% of basic FSI at the same premium rate, and a township that buys extra FSI must provide additional built-up space for economic activities, such as offices and shops, at 10%.6 The Government can revise both premium rates.1
  • A 50% stamp-duty concession, which the regulation provides at one stage only: either the developer’s purchase of the land or the first sale of each unit.1
  • No separate NA permission. Land in the approved master layout is treated as non-agricultural. The regulation also halves the annual NA assessment. But an amendment to the Land Revenue Code, published on 31 December 2025, replaced annual NA assessment with a one-time premium, and it is not settled whether townships get any reduction in that premium.13
  • 50% off development charges and building-permission scrutiny fees, and 50% off the royalty on earth dug out on site (no royalty if it is used within the township).1
  • Adjoining government land may be granted by the Revenue and Forest Department under its rules, up to 10% of the township area.1
  • Relief from land-purchase limits for the developer buying land for an approved township: the regulation disapplies the agricultural-land ceiling and the rule that only farmers may buy farmland.1 Section 63-1A of the tenancy law allows land to be bought for an integrated township project. As amended in April 2026, only Class I (unrestricted) land can be bought this way, and the buyer pays the one-time conversion premium.45

The March 2024 changes

  • Changes applied before final approval. On 5 March 2024 the Urban Development Department published a notice proposing changes to Regulation 14.1 and inviting objections. In the same notice it directed, under section 154(1) of the Maharashtra Regional and Town Planning Act, that the changes come into force immediately, without waiting for final sanction.6 The main changes: a High Power Committee advises on locational clearance; the rules apply directly in development-plan areas; extra FSI becomes 100% of basic FSI for every township; the 2% city-level land is worked out after deducting plan reservations; the bank guarantee can be released in stages as infrastructure is built; and reserved plots inside the township can be developed under the accommodation-reservation rules. The notice does not change the stamp-duty, NA, social-housing or processing-fee provisions. We have not found a later notification sanctioning, changing or withdrawing these changes. Ask the Town Planning office which version it is applying before relying on any figure on this page.
  • Non-agricultural conversion. An amendment to Maharashtra’s Land Revenue Code (Maharashtra Act LVII of 2025, published 31 December 2025) means the Collector’s separate NA permission is no longer needed where the use is allowed under a development or regional plan or the planning regulations. A one-time premium, collected before development permission, replaces the annual NA tax. Land held on any occupancy class other than Class I keeps that status when development permission is given. How the change sits with the township’s own NA concession is not yet settled (see above).3 See our state-by-state conversion guide.

What this means for a landowner

  • Below 40 ha? You cannot use this route alone. Neighbours can pool land, or a developer can assemble it, but the developer must hold ownership, or registered development agreements or powers of attorney, for every parcel before it applies for the State’s clearance.1 Every owner signs, and registers, early: take legal and tax advice on what that triggers. Our due-diligence checklist lists the records each owner will need.
  • Your share is affected by the rules. The zone premium and the premium for extra FSI are costs. Extra FSI raises what can be built; social housing at capped prices, open space, amenities and any land handed over lower what can be sold. Ask any developer which assumptions their offer uses, and who pays each premium. Our JDA explainer explains how the share is negotiated.
  • Timelines are long. Clearance, letter of intent and master layout come before any phase can be registered with MahaRERA and sold.
  • Concessions come with conditions. Each depends on meeting the regulation’s terms. The locational clearance is cancelled automatically, with no refund of fees or premium, if its conditions are not met in time, and the township must be completed within 10 years of master-plan approval unless the Government allows longer.1
Questions to settle before you sign
  • Which zone is your land in under the regional or development plan, and what is its agricultural rate in this year’s Annual Statement of Rates? Together they set the zone premium.
  • Is the land inside a development-plan area? If so, the planning authority approves the master layout, and 2% of the land, after deducting plan reservations, goes to it free of cost.
  • How much of the land is hill slope, flood zone or eco-sensitive buffer, and is any of it excluded land?
  • Is every parcel Occupancy Class I? Ask your lawyer what the April 2026 tenancy amendment means for any parcel that is not.
  • Is the Town Planning office applying the March 2024 changes, and has anything changed since? What is the current processing fee?
  • Ask your lawyer how the 50% stamp-duty concession is applied at registration, and what one-time NA premium the township will pay.

For the full sequence from title to RERA registration, read our guide on how to develop 100 acres.

Sources
  1. Unified Development Control and Promotion Regulations (UDCPR) 2020: title page (applicability) and Regulation 14.1 (Integrated Township Project), text as sanctioned 2 Dec 2020 (for the changes directed on 5 Mar 2024, see source 6), Urban Development Department, Government of Maharashtra (copy hosted by GRIHA; mirror). Accessed 27 Nov 2026.
  2. Real Estate (Regulation and Development) Act 2016, s.3 and Explanation (Gazette text, state mirror), Haryana RERA, Acts page. Accessed 27 Nov 2026.
  3. Maharashtra Land Revenue Code (Second Amendment) Act 2025, Mah. Act LVII of 2025, Maharashtra Government Gazette Extraordinary Part VIII, 31 Dec 2025 (new ss.42 and 47; s.47A deleted), pp.197–199 of the compilation, PRS Legislative Research (compilation of Gazette text). Accessed 27 Nov 2026.
  4. Maharashtra Tenancy and Agricultural Lands, Hyderabad Tenancy and Agricultural Lands and Maharashtra Tenancy and Agricultural Lands (Vidarbha Region) (Amendment) Act 2015, Mah. Act I of 2016, Maharashtra Government Gazette Extraordinary Part VIII, 1 Jan 2016 (s.63-1A as amended: purchase for Integrated Township Projects), PRS Legislative Research (compilation of Gazette text). Accessed 27 Nov 2026.
  5. Maharashtra Tenancy and Agricultural Lands Laws (Amendment) Act 2026, Mah. Act XVIII of 2026, Maharashtra Government Gazette Extraordinary Part VIII, 15 Apr 2026 (new s.63-1A(2)), Bombay High Court library (Gazette text). Accessed 27 Nov 2026.
  6. Government Resolution TPS-1821/452/CR-105/2022/UD-13, 5 Mar 2024, publishing a notice under ss.37(1AA)(a) and 20(3) of the MRTP Act 1966 proposing changes to UDCPR Regulation 14.1 (Integrated Township Project), with directions under s.154(1) that the changes come into force immediately; Schedule A of changes at pp.5–18 (scanned image; English, followed by Marathi), Urban Development Department, Government of Maharashtra. Accessed 27 Nov 2026.

This guide explains how these structures generally work. It is not legal or tax advice for your situation. Report an error · Editorial policy