Pune west runs from the Hinjawadi IT park through Mahalunge and Maan to Mulshi and the Maval side towards Lonavala. PMRDA gives building permission in most of its villages. For the 23 villages added to Pune Municipal Corporation in 2021, news reports say PMC became their planning authority in February 2026, though PMRDA's website still lists them, so ask both. Metro Line 3 opened to passengers on 4 November 2026, according to news reports. Each township phase, and any plotted or villa scheme above RERA's size limits, must be registered with MahaRERA before it is advertised, booked or sold. Before paying, check that registration, zoning, permissions and title.
“Pune west” is not an official name. In this guide it means the belt from the Hinjawadi IT park (also spelt Hinjewadi) and the villages around it, through Mahalunge and Maan, out along the Paud road towards Pirangut in Mulshi taluka, and across to the Maval side of the Mumbai–Pune Expressway towards Lonavala. No single city runs it. Which body plans your plot decides which building rules apply, who gives permission, and what can be built next door.
This guide sets out who plans what, which infrastructure is open or being built as of 27 November 2026, and how to check a project before you pay anything. It names no projects, prices or “best” lists.
Who plans Pune west
PMRDA. The Pune Metropolitan Region Development Authority (PMRDA) plans the region around Pune and Pimpri-Chinchwad: 5,215.26 sq km and 674 villages by its own count, including villages in Maval and Mulshi talukas.1 Its development-permission page, updated on 23 November 2026, still describes it as the Special Planning Authority for 697 villages, including 23 villages added to Pune Municipal Corporation (PMC) limits. News reports say that changed in February 2026 (see PMC below). It issues layout and building permissions, zoning certificates and occupancy certificates, online through the state’s BPMS system. Its site says it applies its own Development Control and Promotion Regulations of 2018 across its region, and the Unified Development Control and Promotion Regulations 2020 (UDCPR) in the 23 merged villages.2 UDCPR’s own text says it applies to all planning authorities and Regional Plan areas in Maharashtra except listed areas such as MIDC and Lonavala, and PMRDA is not among those exceptions.3 Ask the planning authority in writing which regulations it will apply to your plot.
No final development plan. PMRDA’s website carries a notice, with a publish date of 27 September 2025, that its draft development plan has been cancelled under section 40 (read with sections 23, 26 and 28) of the Maharashtra Regional and Town Planning Act 1966 and section 21 of the Maharashtra General Clauses Act 1904.4 The Free Press Journal reported on 28 September 2025 that this was the August 2021 draft, and that PMRDA’s commissioner said the Regional Plan would continue until a new plan is prepared.5 PMRDA dates the Regional Plan to 1997.2 Its development-permission page, updated on 23 November 2026, still says PMRDA implements the 2021 draft plan. That conflicts with the cancellation notice, so rely on the notice and on a zoning certificate, not on that page.24 PMRDA’s notifications page (July 2026) lists a declaration of intention to prepare a draft structure plan for its region, and notices on appointing consultants for it.6 So treat any zoning map sold online or shown in a sales office with care, and ask for a zoning certificate for the survey number.
PMC. The State added 23 villages, including Mahalunge, Sus and Bavdhan Budruk, to PMC in 2021; the final notification was reported on 30 June 2021.7 PMRDA was then made their Special Planning Authority, as its development-permission page still states.2 In February 2026, according to news reports, the State’s Urban Development Department made PMC the planning authority for these villages instead.8 In July 2026 PMRDA was reported to be still handing over its records.9 In October 2026 CREDAI Pune Metro, a developers’ body, was reported to have asked the State to keep PMRDA as planning authority for township projects in these villages.10 We could not find the government notification itself. If your plot is in one of these villages, ask both PMC and PMRDA in writing which body will decide your building permission and which regulations it will apply.
PCMC. According to Punekar News (3 September 2026), a proposal to bring Hinjawadi, Maan, Marunji, Nere, Jambe, Sangvi and parts of adjoining areas into Pimpri-Chinchwad Municipal Corporation (PCMC) has been pending since PCMC’s general body approved it in 2015, and the Chief Minister, speaking at an event in Mumbai, said a decision would come “very soon”.11 We found no notification as of 27 November 2026. If one is issued, ask how a project’s approvals carry over.
MIDC and Lonavala. The Rajiv Gandhi Infotech Park at Hinjawadi, in four phases, is a Maharashtra Industrial Development Corporation (MIDC) area.12 MIDC areas and Lonavala Municipal Council are both outside UDCPR,3 so ask which regulations apply there.
| Body | Where | What to ask it for |
|---|---|---|
| PMRDA | 674 villages in its region, including villages in Mulshi and Maval. Its website still lists the 23 villages merged into PMC; reports say PMC became their planning authority in February 2026 | Zoning certificate, layout and building permission, occupancy certificate |
| PMC | City limits, which since 2021 include Mahalunge, Sus and Bavdhan Budruk | For the merged villages, ask PMC and PMRDA which body now gives building permission |
| PCMC | Pimpri-Chinchwad; may take in Hinjawadi and nearby villages (not decided as of 27 Nov 2026) | Watch for a merger notification |
| MIDC | Rajiv Gandhi Infotech Park, Phases 1 to 4 | Outside UDCPR |
| Lonavala Municipal Council | Lonavala town | Outside UDCPR; ask which rules apply |
| MSRDC | Building the outer ring road | Alignment and land-acquisition maps |
The four corridors
| Corridor | Planning | What to know (as of 27 Nov 2026) |
|---|---|---|
| Hinjawadi and nearby villages (Hinjawadi, Maan, Marunji) | IT park: MIDC. Villages: not in a municipal corporation yet; confirm the planning authority with a zoning certificate | Metro Line 3 starts at Maan. A merger into PCMC is proposed but not decided |
| Mahalunge–Maan | Town planning scheme listed by PMRDA (page updated 26 Nov 2026). Mahalunge is inside PMC limits, where planning reportedly moved to PMC in Feb 2026; Maan is not. Ask both which body runs the scheme | PMRDA’s first town planning scheme covers land here. The preliminary scheme was sanctioned on 2 December 2019, and a variation is under way because the blue and red flood lines changed |
| Paud road and Pirangut (Mulshi) | Confirm with a zoning certificate | Ask whether the land is near the western ring road alignment (see below) |
| Maval and the Lonavala side | Villages: confirm with a zoning certificate. Lonavala town: its municipal council | The western ring road starts at Urse in Maval taluka. Lonavala is outside UDCPR |
Sources for the table: PMRDA,213 news reports on PMC’s planning role8 and the PCMC merger,11 the ring road’s public-hearing page,14 UDCPR.3
The town planning scheme matters if you are buying a plot at Mahalunge or Maan. In a scheme, the authority redraws the holdings: owners get back a “final plot”, and land is set aside for roads, open space, amenities and housing. PMRDA’s figures for this scheme include 120.14 ha of final plots for landowners and 49.95 ha under roads, and it sets the FSI of a final plot as the original plot area divided by the final plot area, multiplied by 1.25.13 Ask which final plot a property sits on, and whether the variation changes it.
Infrastructure: what is open, what is being built
Metro Line 3 (Pink Line)
- Route: an elevated line of 23.203 km with 23 stations, from Maan near the Hinjawadi IT park towards Shivajinagar.15
- Whose project: PMRDA’s, as the first public–private partnership under the Centre’s New Metro Rail Policy 2017. The concessionaire, Pune IT City Metro Rail Ltd, is a joint venture of TRIL Urban Transport and Siemens Project Ventures.15
- Cost: ₹8,313 crore, including land acquisition and utility shifting.15
- Timeline: the concession was signed on 21 September 2019. The scheduled completion date was 25 March 2025; PMRDA extended it to 31 March 2026.15
The Prime Minister inaugurated the line by video link on 3 November 2026, according to All India Radio and local reports,1620 and passenger services began on 4 November,17 at 17 stations, as announced the week before.18 Passengers can change to the existing metro at District Court station, according to the same pre-launch report.18 Balewadi High Street and Balewadi Phata opened on 25 November, taking the line to 19 of its 23 stations. The remaining four, including Shivajinagar, were expected within two months, according to the local MP.19 These station counts come from news reports, so check before relying on a particular station.
On the same day the Prime Minister also laid foundation stones for four Phase II metro corridors, including Vanaz to Chandani Chowk, according to a local news report.20 A foundation stone is not a completion date.
The outer ring road
The Maharashtra State Road Development Corporation (MSRDC) is building a ring road around Pune. Its western alignment runs 68.8 km from Urse in Maval taluka to Varve (Kelwade), according to the Maharashtra Pollution Control Board’s page for the project’s environmental public hearing, held on 14 October 2021.14
In September 2026 a Pune newspaper, citing MSRDC, reported that the western section was about 30% complete, with a target of opening it to traffic by December 2027.21 That is a target, not a commitment.
PMRDA is separately developing its own ring road, which it now calls the inner ring road: 83.12 km long and 65 metres wide, with land acquisition under way in phases, according to its project page (updated 24 November 2026).22 If a plot is near either alignment, ask whether any part of it is reserved or being acquired for the road.
How to read infrastructure news. Dates move. Metro Line 3 was due in March 2025, according to PMRDA, and opened to passengers in November 2026, according to news reports.1517 Judge a project on what is open and what you can check today, not on a promise about what a road or station will do to prices.
Townships and second homes: what the rules mean here
Every phase is registered on its own. Under the Real Estate (Regulation and Development) Act 2016, no promoter may advertise, market, book or sell any plot, apartment or building in a real estate project in a planning area without registering it. Where a project is built in phases, each phase is a separate project and needs its own registration. A planning area includes a regional development plan area.23 So a township’s later phases may not be registered yet.
Plotted and villa schemes are covered too. The Act’s definition of a real estate project includes developing land into plots for sale. The Act exempts projects where the land is no more than 500 square metres, or there are no more than eight apartments, across all phases; a state can lower these limits.23 A “farm plot” or “villa plot” scheme in Mulshi or Maval being sold without a MahaRERA number is a warning sign. Ask the seller in writing why it is not registered.
Agricultural land has its own rules. Under section 63 of the Maharashtra Tenancy and Agricultural Lands Act 1948, a sale of agricultural land to someone who is not an agriculturist is not valid unless the Collector (or an officer authorised by the State) gives permission, or the Act provides otherwise.24 Our state-by-state conversion guide explains how land is converted for building, and what changed in Maharashtra in December 2025.
Large townships. UDCPR Regulation 14.1 sets the rules for integrated townships of 40 hectares (about 100 acres) or more in Regional Plan areas. Where a planning authority has not yet adopted its own township rules, Regulation 14.1 applies until it does. Lonavala and MIDC areas are outside UDCPR altogether.3 PMRDA’s site lists its own 2018 regulations for its region,2 while UDCPR does not list PMRDA among its exceptions,3 so ask the planning authority in writing which rules govern a township’s approval. Our explainer on Maharashtra’s integrated township rules covers Regulation 14.1.
The Western Ghats draft. According to Down To Earth (12 October 2026), the Union environment ministry reissued a draft notification on 27 July 2026 to declare parts of the Western Ghats, in six states including Maharashtra, an ecologically sensitive area. As reported, it would prohibit specified construction projects of 20,000 square metres of built-up area or more, and townships above set thresholds, in the listed villages. It is still a draft, and we have not seen the Gazette text or its village list.25 For land on the Ghats side of Mulshi or Maval, ask your lawyer to check whether the village is on its list.
Rental and branded homes. If a second home comes with a hotel brand or a rental programme, read how branded residences work in India first, and treat any promise of rental income with suspicion.
How to check a project in Pune west
- MahaRERA registration. Search the MahaRERA register by project name and district, and check its list of revoked projects.26 Our step-by-step guide to verifying a project on RERA shows which fields to read: promoter, completion date, extensions, quarterly progress and complaints.
- The phase you are buying. Confirm that the registration covers your building or plot, not just an earlier phase.23
- The promoter and the land. Check that the promoter on MahaRERA matches the seller on your agreement, and that the land in the registration matches the survey numbers in your agreement.
- Zoning. Ask PMRDA for a zoning certificate for the survey number. In the 23 villages merged into PMC, ask PMC as well. Inside a municipal council’s limits, ask the council.28
- Permissions. Ask for the layout and building permission, and later the occupancy certificate. In most of the PMRDA region these are issued by PMRDA. In the 23 merged villages, check whether PMC or PMRDA issued them.28
- Town planning schemes. At Mahalunge or Maan, ask for the final plot number and whether the scheme variation affects it.13
- Flood lines. Ask where the blue and red flood lines run. PMRDA is redrawing its first scheme because they changed.13
- Roads and reservations. Check whether the land is near the ring road or metro alignments, or reserved for a road.1422
- Western Ghats draft. For land in the hills, ask whether the village is on the draft list.25
- Title. Ask for the 7/12 extract and the mutation entries, and have a lawyer check them. Our due-diligence checklist lists the land records to ask for. If an area is given in guntha, convert it with our land-unit converter.
If you own land in Pune west
If a developer approaches you about a joint development or revenue-share deal, start with our explainer on how a joint development agreement works, then run your own offer through the sale, JDA or revenue-share comparison. Before you sign, check the developer with the due-diligence checklist.
What this guide does not do
We name a project only if it is registered with RERA, and then with its registration number. This guide names none. It gives no prices and no forecasts. Infrastructure is described only where it is open or officially under way, with the source and the date.
- PMRDA home page: area of the Pune Metropolitan Region (5,215.26 sq km), number of villages (674), municipal corporations and councils, and current works in Maval and Mulshi talukas, Pune Metropolitan Region Development Authority. Accessed 27 Nov 2026.
- Development Permission department: Special Planning Authority for 697 villages (including 23 villages added to PMC), governing Acts, Regional Plan 1997, DCPR 2018 and UDCPR 2020, services and BPMS (page updated 23 Nov 2026) (as the page states), Pune Metropolitan Region Development Authority. Accessed 27 Nov 2026.
- Unified Development Control and Promotion Regulations (UDCPR) 2020: title page (areas excluded, including MIDC and Lonavala Municipal Council) and Regulation 14.1.1 (Integrated Township Project: applicability and 40 ha minimum), text as sanctioned 2 Dec 2020, Urban Development Department, Government of Maharashtra (copy hosted by GRIHA; mirror). Accessed 27 Nov 2026.
- Notice: draft development plan of PMRDA cancelled under section 40 (with sections 23, 26 and 28) of the MRTP Act 1966 and section 21 of the Maharashtra General Clauses Act 1904; publish date 27 Sep 2025, Pune Metropolitan Region Development Authority. Accessed 27 Nov 2026.
- Pune: PMRDA issues official notification cancelling 2021 draft development plan (news report, 28 Sep 2025; secondary source), Free Press Journal. Accessed 27 Nov 2026.
- Notifications and circulars: declaration of intention to prepare a draft structure plan, and appointment of consultants in urban planning, transportation and environment planning for the PMRDA Structure Plan (files dated May 2026), Pune Metropolitan Region Development Authority. Accessed 27 Nov 2026.
- Pune mayor welcomes final notification on inclusion of 23 villages into PMC, with the list of villages (news report, 30 Jun 2021; secondary source), Free Press Journal. Accessed 27 Nov 2026.
- Pune: PMC gets planning and building-permission authority over 23 merged villages, following Urban Development Department orders of 11 Feb 2026 (news report, 12 Feb 2026; secondary source), Punekar News. Accessed 27 Nov 2026.
- PMRDA expedites transfer of records for 23 villages merged into PMC; formal handover expected after digitisation (news report, 13 Jul 2026; secondary source), Punekar News. Accessed 27 Nov 2026.
- CREDAI Pune Metro asks State to retain PMRDA as planning authority for integrated township projects in the 23 merged villages; UDD seeks PMC's opinion (news report, 23 Oct 2026; secondary source), Punekar News. Accessed 27 Nov 2026.
- Pune: Hinjewadi merger with PCMC gets fresh push, CM Fadnavis says decision soon (news report, 3 Sep 2026; secondary source), Punekar News. Accessed 27 Nov 2026.
- MIDC online land allotment system, land bank: Rajiv Gandhi Infotech Park (Hinjawadi) Phases 1 to 4, Maharashtra Industrial Development Corporation. Accessed 27 Nov 2026.
- Mahalunge–Maan TPS-1: overview, scope of work (final plots, roads, FSI formula) and status (preliminary scheme sanctioned 2 Dec 2019; variation under way), Pune Metropolitan Region Development Authority. Accessed 27 Nov 2026.
- Public hearing: Pune Ring Road Western Alignment (68.8 km), starting at Urse village (Ch 0+00) and ending at Varve (Kelwade) (Ch 68+80); project proponent MSRDC; hearing held 14 Oct 2021, Maharashtra Pollution Control Board. Accessed 27 Nov 2026.
- Maan Hinjawadi Shivajinagar Metro Line (Pune Metro Line 3): salient features, cost and funding, concession, extension of time and progress, Pune Metropolitan Region Development Authority. Accessed 27 Nov 2026.
- PM Modi to inaugurate Pune's Shivajinagar–Maan–Hinjawadi metro corridor on November 3 (news report, 31 Oct 2026; secondary source), All India Radio News. Accessed 27 Nov 2026.
- Pune's Hinjewadi–Shivajinagar metro line opens for passengers today after PM Modi's inauguration (news report, 4 Nov 2026; secondary source), Swarajya. Accessed 27 Nov 2026.
- Pune Metro Line 3: 17 stations to open from 4th November, Balewadi stations by December; interchange with the existing metro at District and Sessions Court station (news report, 31 Oct 2026; secondary source), Punekar News. Accessed 27 Nov 2026.
- Pune Metro Line 3 network expands to 19 stations, 4 more expected to open by January (news report, 25 Nov 2026; secondary source), Free Press Journal. Accessed 27 Nov 2026.
- PM Modi inaugurates Pune Metro Line 3, lays foundation stone for four new corridors under Phase II (news report, 3 Nov 2026; secondary source), Punekar News. Accessed 27 Nov 2026.
- Pune Ring Road: western stretch 30% complete, traffic relief expected by 2027 (news report citing MSRDC, 2 Sep 2026; secondary source), The Bridge Chronicle. Accessed 27 Nov 2026.
- Pune Inner Ring Road Project: total length 83.12 km, width 65 m, land acquisition status (page updated 24 Nov 2026), Pune Metropolitan Region Development Authority. Accessed 27 Nov 2026.
- Real Estate (Regulation and Development) Act 2016, ss.2(zh), 2(zn) and 3, with the Explanation on phases (Gazette text, state RERA copy), Haryana RERA, Acts page. Accessed 27 Nov 2026.
- Maharashtra Tenancy and Agricultural Lands Act 1948, s.63: transfers to non-agriculturists barred, with the Collector-permission proviso (statute text, unofficial copy; copy does not show the 2016 additions s.63(1C) and s.63-1A), Indian Kanoon. Accessed 27 Nov 2026.
- Western Ghats ESA: seventh draft faces six-state resistance as conservation hangs in balance (news report on the draft notification of 27 Jul 2026, 12 Oct 2026; secondary source), Down To Earth. Accessed 27 Nov 2026.
- MahaRERA: Search Project (registered and revoked projects, by project name, district and location), MahaRERA. Accessed 27 Nov 2026.
This guide explains how these structures generally work. It is not legal or tax advice for your situation. Report an error · Editorial policy